April 2021-Demould the Hull
- Geoff Carne
- Aug 29, 2021
- 1 min read
Game on, demoulded the hull in between guests & relocated it to the shipping container that serves as a shed at home. Tabbed the chines/keel/joints. Tabbed the winglets & carriage rails on, closed off the stern & installed the rudder gantry. Fairing, a real lot of fairing, built the hull/cradle. fit the fore deck cowlings & installed the cleat mounts & shroud tracks. A bit of paint but more to go
Quite happy with the build so far, a little over weight. Decided not to push things for a Batemans Bay launch, so took her down for a road trip to bend the rig in for sail measurements
Comments